featured image for FISC safety alert: Yarder stabilising ram failure incident

FISC safety alert: Yarder stabilising ram failure incident

7 April 2026

The forestry sector has long relied on Thunderbird TY50 and TY70 tower yarders—machines designed to be light, transportable, and efficient. However, a serious harm injury of a worker, has highlighted a critical safety concern that demands immediate attention.

The yarder was being prepared to shift. Running lines and guys had been retrieved. The tower was pushed into vertical position and the stabilising ram locked. The guy ropes were hooked on the chassis and ratcheted up to remove excessive slack.

However, during the rope retrieval the tail rope over-spooled or “birdnested”. A plan was then made to untangle the rope and run the tail rope out so it could be correctly fleeted back onto the drum. A grapple operator was positioned in front of the hauler to pull the rope out and then manage rope tension as it was wound back on. Another worker was deployed to sit beside the drum and assist fleeting the bottom layer and a 3rd worker, the

hauler driver, had the tail drum engaged, and idling dead slow in 1st gear. The yarder driver was observing the drum and stabilising ram through the cab side window. The rope was being wound slowly onto the drum, and the first layer was half completed when without warning the spear on the stabilising ram snapped.

The broken spear shot forward and landed on the workers hand who had been positioned near the drum. The injury was severe requiring four fingers to be amputated

Investigation findings

  • The investigation revealed that the incident was the result of a stabilising ram failure.
  • It identified that the Thunderbird manual prescribes the slackening of all guylines before rope recovery, therefore the tower was not supported by guylines when the stabilising ram failed.
  • Also, the stabilising ram spear had been replaced with induction-hardened steel rather than the original mild steel design. Induction hardened steel provides excellent wear resistance and strength but does not have the same ductile microstructure of mild steel, which allows it to deform (bend or stetch) significantly under stress before fracturing, it absorbs energy well.

Recommendations for TY50 and TY70 tower yarders

  • Guyline safety: While Thunderbird manuals allow slackening all guylines and locking the pole before rope recovery, it is recommended to keep at least one rear guyline in place to prevent tower collapse if the stabiliser ram fails.
  • Stabilising ram spear: Owners must verify the steel grade of stabiliser ram spears. It is recommended that a replacement spear should be consistent th the original mild steel composition with good energy absorbing ductile properties.
  • Lagged drums: Rope fleeting exposes workers for 15–20 minutes. Lagging drums reduces this risk. Owners should consider replacing at least the front drum when machines undergo major servicing.
  • Annual inspections: Towers must be inspected annually by CBIP-certified inspectors. Inspectors should be briefed on the Kohurau incident and the importance of spear verification and ram integrity.

More >>

Source & image credit: New Zealand Forest Industry Safety Council

More Posts from Issue

Image

Development of slash grapples for residue removal

Issues with woody debris mobilising after severe rainfall events and the new regulations put in place to counter the downstream effects of this, have driven a Forest Growers Research (FGR) project co-funded by MPI and the Forest Growers Levy Trust. ...
Read more
Image

Forestry company parks electric truck despite spike in diesel prices

An electric truck trial in South Australia’s south-east has shown the vehicles are fit for some use in the forestry industry, but are not financially viable — even with diesel prices soaring. Fennell Forestry launched a trial using a truck converted ...
Read more
Image

Building the Future: Minecraft in NZ Forestry

An immersive learning experience. Forestry Minecraft World isn’t just a game, it’s a complete educational tool developed with funding from the WIDE Trust. The resource includes a Forestry Minecraft Guide Book for teachers and a series of modular challenges for students. These ...
Read more
Image

FICA fuel adjustment factor calculation

As you are well aware as a result of the conflict in the Middle East fuel prices have risen rapidly over the past two weeks.  FICA has been talking with FOA and MPI regarding the situation and has been asked ...
Read more
Image

Waratah Forestry Equipment introduces the new FL90 directional felling head

Waratah Forestry Equipment has launched the all-new FL90 directional felling head, purpose-built to deliver strength, agility and intelligent performance in a size class that fits a wide range of applications. Designed for 20+ metric ton carriers, the FL90 provides loggers with ...
Read more
Image

Ponsse launches the next generation Opti 5G information system for track-based machines

Ponsse continuously develops solutions that improve the work of forest machine operators and is now introducing the next-generation Opti 5G information system also for tracked based machines. The system is specifically designed to enhance productivity, ease of use, and data ...
Read more
Image

A key reason 84% of fleets are investing in safety tech

The ‘Mobilizing the Future of Fleets Report: 2026 Risk and Exoneration Edition’ uncovered that a third (34%) of fleets reported being impacted by fraudulent motor claims. 77% of respondents also agreed that increasing litigation and legal costs are now a ...
Read more
Image

Building a wildfire business case for biomass harvesting

Following the 2023 record-breaking year of extreme wildfires across Canada, the topic of how to best manage wildfires came to the forefront for many organisations within Canada’s forest products sector, as well as all levels of government. One organisation that has ...
Read more
Image

Historic first at Eastland Port

Recently, the Norse Antwerp came in smoothly alongside the Yangtze Keeper at Eastland Port – and history was made. For the very first time, two 180-metre long vessels were able to berth next to each other on Wharves 7 and ...
Read more