
State-owned China Ocean Shipping Group (COSCO) has launched the world’s largest electric container ship, which will begin a regular service between Shanghai and Nanjing and save 3,900kg of fuel for every 100 nautical miles sailed.
The Greenwater 01 arrived at the deepwater Yangshan Port in Hangzhou Bay south of Shanghai, an all-electric container ship measuring 119.8 meters in length, width of 23.6 metres and depth of 9 metres.
It is the world’s first 10,000-tonne pure electric container ship and boasts a top speed of 19.4km/h and a battery capacity of over 50,000kWh. Each battery container offers 1,600kWh of electricity and utilises a container similar to the standard 20-foot containers the vessel transports.
The number of battery packs can therefore be modified depending on the journey by simply modifying the number of battery containers are installed onboard. The Greenwater 01 is expected to be able to reduce carbon dioxide emissions by 12.4 tonnes for the same distance travelled.
Image credit: Cosco
Source: thedriven
More Posts

From AI to heavy machinery: What’s on at HarvestTECH & Wood Transport Logistics 2026

Caterpillar is bringing to AI deployment what it learned from automating mining

Free program to help SMEs advance AI and digital tech ideas in Queensland

Tairawhiti – Productivity is bigger than the crew

Next generation of Komatsu forestry machines

Enforcement data reveals where forestry needs to lift its game

Learning Through the Storm: Report released

Testing New Zealand’s first heavy electric loader

New Canopy Class certification raises the bar for contractors

Forestry confirms new training partnership with Competenz

Recent spike in log truck & trailer rollovers

Driver fatigue: What half a billion kms has taught us

Excavator fleet at iron ore mine now fully electric

HarvestTECH & Wood Transport Logistics 2026 programme released

Linfox rolls out 26 heavy-duty electric trucks

Kesla introduces new F-Series forwarder crane range

NZ safety gains drive drop in forestry’s injury claims

Ensuring safety in native timber harvesting

We’re targeting 35% electrification in 10 years – but 35% of what?

Government backs major North Island freight hub

